News

News - Konvar.rs
Works on the gasification of Ivanjica started yesterday in Prilicko polje. Steel pipes of medium pressure, profiles of 219 mm plastic-coated, will be placed in the next ten days from the foot of Gradina to the bridge in Donji Radaljev, about 2 km long, and then a new 4 km long route opens.
Published in Novosti
Under the slogan "Think and act globally" in April 2018. we signed a contract for the execution of works on the construction of distribution gas pipeline network of low pressure polyethylene pipes in the territory of the municipality of Golubac
Published in Novosti
Disassembling the gas line DN300, reconstructing and relocating the heating network from the DN600-DN200 and moving the water supply network DN150 to all standards and technical requirements we have done on the ACS project.
Published in Novosti
Page 2 of 3

Konvar d.o.o.

Society for the design, manufacture, service, quality control and engineering.

Follow us

Konvar d.o.o. Beograd