
The importance of the development of the gasification system is reflected in the safe, high-quality and regular supply of consumers, as well as the creation of conditions for reliable and safe operation of energy systems. At the location of the main distribution node (GRC) Pancevo, Konvar has started works on the construction of the receiving and dispatching cleaning station and the DN500 transport gas pipeline in the length of 10 km, which will connect the measuring station MS-3 on the main gas pipeline (interconnector) with the Serbia gas transmission system.