Construction of heating plant

Works on the gasification of Ivanjica started yesterday in Prilicko polje. Steel pipes of medium pressure, profiles of 219 mm plastic-coated, will be placed in the next ten days from the foot of Gradina to the bridge in Donji Radaljev, about 2 km long, and then a new 4 km long route opens.
Published in Novosti
Long-term cooperation with Millennium Team doo continued in 2018 and through a project that is in many ways different from the usual projects in the construction of the water supply network due to the diameter of the pipes Ø1512mm with 14mm thickness and its geometry of the route, which partly enters the Savsko Lake .
Published in Novosti

Konvar d.o.o.

Society for the design, manufacture, service, quality control and engineering.

Follow us

Konvar d.o.o. Beograd