We have our necessary machinery as well as qualified staff for assembly and welding, as well as the production of heat shrinkable couplings. More

HEAT CONSTRUCTION

We are engaged in construction of low, medium and high pressure gas pipelines, as well as measuring stations, measuring and controlling odorizing stations and main measuring stations. More

CONSTRUCTION OF GAS AND GAS

The horizontal conductor is designed for installation of underground cables and pipes at a distance of 200m, depending on the configuration of the terrain and land category. More

HORIZONTAL DRILLING IN

News
Projekat gasifikacije opština Voždovca, Palilule i Barajeva nastavlja se utvrđenim tempom prema planu i potrebama građana.
Published in Novosti
Works on the gasification of Ivanjica started yesterday in Prilicko polje. Steel pipes of medium pressure, profiles of 219 mm plastic-coated, will be placed in the next ten days from the foot of Gradina to the bridge in Donji Radaljev, about 2 km long, and then a new 4 km long route opens.
Published in Novosti

Konvar d.o.o.

Society for the design, manufacture, service, quality control and engineering.

Follow us

Konvar d.o.o. Beograd